Clock House, Bromley By Bow

Project Details Location Imperial St, Bromley By Bow Architects Assael Project Summary These new homes in Bromley by Bow, East London will form part of the most important regeneration scheme in East London since the 2012 Olympics. The Guinness Partnership has chosen Henry Construction to be their partner to deliver phase 1 which is 491 […]

Ascot Rd, Watford

Project Details Location Ascot Road, Watford Client Project Summary 4 Tower blocks around new communal gardens Total of 514 plots – Mix of PRS / Shared ownership and affordable rent Residents lounge on the 35th floor Re-use and re working of existing double basement structure with extensive cut / carve required 12 – 35 storeys […]

Thrayle House

Project Details Location Brixton Client Project Summary 177 residential units plus 4 town houses over 4 blocks ranging from 6 to 20 floors. Mixture of social, ‘affordable’ and private housing, ranging from studio flats to four bedroom houses. OUR Work Explore Recent Projects Residential PRS Taberner House Residential PRS Chesterfield House Residential Social Housing Clock […]

King Point, Reading

Project Details Location 120 King’s Road, Reading Client Project Summary The site sits on the corner of King’s Road and Watlington Street, occupying a prominent site beside the River Kennet and the Watlington Street Bridge. This is an important development in the Reading area. The building is 18 storeys above a single basement level and […]

Tollers Lane

Project Details Location South Croydon Client Project Summary The project is the delivery of 40new build residential units divided over three sites, plus a new community centre Block A Ground + 2 – 3 Storey Houses Block B Ground + 2 – Duplex Apartments and Apartments Block C Ground + 2 – 2 Storey Houses […]

Press House

Project Details Location Press Road, Neasden Project Summary Press House comprises of the demolition of the existing six story building occupying the site and the construction of a new residential development of 74 apartments.The building will be delivered to first floor slab level in reinforced concrete and will be a Cross Laminate Timber (CLT) frame […]